
Pattern and cutting
Patterns are drafted, graded and marked in-house. Panels are cut to the marked ply and checked against the pattern before they move on.
Our factory
Cutting, sewing, decoration, inspection and packing are in one place. That is what makes a 15-day timeline realistic, and what makes a reorder identical to the first run.

Inside the building
Each photograph below is of the same production floor, in the sequence an order moves through it.

Patterns are drafted, graded and marked in-house. Panels are cut to the marked ply and checked against the pattern before they move on.

A line of industrial machines covers overlock, flatlock and coverstitch work, which is what allows heavyweight fleece and fine jersey on the same floor.

Screen printing, DTG, DTF transfer and embroidery machines sit in the decoration area, so a print and an embroidered detail on one garment stay in one workflow.

Garments are measured against the size chart, checked against the sealed sample and packed to your folding and labelling instructions.
Capacity
Stated as fact rather than as a marketing number, because you will plan your order around it.
| Item | Detail |
|---|---|
| Minimum order | 30 pcs per style |
| Bulk order range | 1,000–10,000 pcs |
| Standard lead time | 15 days |
| Production staff | 101–200 people |
| QC team | 5–10 inspectors |
| Development and R&D | 11–20 people |
| Office area | 101–500 m² |
| Nearest export port | Ningbo, China |
| Export markets | 80% North America · 20% Eastern Europe |
The floor
No stock photography on this page. The workshop photographs above show the floor your order moves across; these are the finishes applied on it.




If you are placing a first order, a 20-minute call is usually faster than a week of email. We will show you the line that would run your order.
Or email jacknbhood@gmail.com with your requirement.